As Planned for linux

How to Download As Planned

Written by besukohu

Table of Contents:
1. Screenshots
2. Installing on Windows Pc
3. Installing on Linux
4. System Requirements
5. Game features
6. Reviews

As Planned Screenshots

    As Planned game for Linux 1 As Planned game for windows Pc 1 As Plannedfor windows and Linux 1

How to Install As Planned on Windows Pc

  1. Click on the As Planned download button below.
  2. Choose "Install" to install the game on the windows steam client.
  3. Follow the on-screen prompts
  4. Let it download the Full Version.
  5. Once a game is downloaded, use the Windows Steam Client to play the game.

=== Download Game ====


Download for pc →

Guide: Installing As Planned on Linux with Steam Proton

This guide describes how to use Steam Proton to play and run Windows games on your Linux computer. Some games may not work or may break because Steam Proton is still at a very early stage.


1. Activating Steam Proton for Linux:
Proton is integrated into the Steam Client with "Steam Play." To activate proton, go into your steam client and click on Steam in the upper right corner. Then click on settings to open a new window. From here, click on the Steam Play button at the bottom of the panel. Click "Enable Steam Play for Supported Titles."

Alternatively: Go to Steam > Settings > Steam Play and turn on the "Enable Steam Play for Supported Titles" option.

Valve has tested and fixed some Steam titles and you will now be able to play most of them. However, if you want to go further and play titles that even Valve hasn't tested, toggle the "Enable Steam Play for all titles" option.


2. Choose a version
You should use the Steam Proton version recommended by Steam: 3.7-8. This is the most stable version of Steam Proton at the moment.


3. Restart your Steam
After you have successfully activated Steam Proton, click "OK" and Steam will ask you to restart it for the changes to take effect. Restart it. Your computer will now play all of steam's whitelisted games seamlessly.


4. Launch Stardew Valley on Linux:
Before you can use Steam Proton, you must first download the Stardew Valley Windows game from Steam. When you download Stardew Valley for the first time, you will notice that the download size is slightly larger than the size of the game.
This happens because Steam will download your chosen Steam Proton version with this game as well. After the download is complete, simply click the "Play" button.


System Requirements

Windows Pc Requirements

Minimum:
  • OS: Windows 10
  • Processor: Intel Core i3
  • Memory: 1 GB RAM
  • Storage: 100 MB available space

No maximum requirements!!

Linux Requirements

No minimum requirements!!
No maximum requirements!!

Mac Requirements

No minimum requirements!!
No maximum requirements!!

What is As Planned? Features and Description

"As Planned" is a puzzle game in which players give a limited number of instructions to a slime that repeats the same movement to move boxes to specified positions.

"As Planned" is a new type of Sokoban in which the player solves puzzles by giving instructions to the slime, which repeats the same movements, in the appropriate turns.
Slime can only make simple movements such as moving one step, changing direction, or sliding in one direction.Besides, they cannot remember many moves, so they repeat the same moves. As it is, of course, it is impossible to solve the puzzle.
This is where the player comes in. The player can change the slime's movement slightly by giving instructions as a bird riding on top of the slime. The instructions can only be given a limited number of times, gimmicks such as holes and moving floors that increase as the stage progresses, and the slime that does not grow at all. Your brains are tested in 50 puzzles that are plagued by various constraints.

User Reviews

No reviews yet!!

keyboard_arrow_up